KFIA Cable Management System

Dammam Airports · OSP / ISP Fiber · Structured Cabling

Program Lifecycle

Pilot → Go-Live → Hypercare 2 bulan → O&M Awal 12 bulan (+opsi 4 tahun)

Pilot 72% complete
PHASE 01

Pilot

6 weeks

Validasi CMS di Terminal 1 & MDF utama sebelum go-live.

15 Jun 202631 Jul 2026
PHASE 02

Go-Live

2 weeks

Cutover produksi seluruh OSP/ISP fiber KFIA.

01 Aug 202614 Aug 2026
PHASE 03

Hypercare

2 months

Dukungan intensif on-site 24/7 pasca go-live.

15 Aug 202615 Oct 2026
PHASE 04

O&M Awal

12 months

Operations & Maintenance tahun pertama.

16 Oct 202616 Oct 2027
PHASE 05

O&M Extension (opsional)

4 years

Opsi perpanjangan hingga 4 tahun.

17 Oct 202717 Oct 2031

Total Fiber Assets

18,742

+312 this week

OSP + ISP + Structured

OSP Route (km)

486.3

+4.1 km

Outside Plant fiber

ISP Cables

6,204

+58

Inside Plant terminations

Active Alarms

7

-3 vs yesterday

3 critical, 4 warning

SLA Compliance

99.4%

+0.2%

30-day rolling

Open Work Orders

23

+2

5 provisioning, 18 maint.

Fiber Utilization & Incidents · 30 days

OSP vs ISP average utilization, incident count

Asset Mix
OSP Fiber
486 km
ISP Fiber
6,204 cables
Structured
12,052 links
Fiber Asset Inventory
Cable IDRouteTypeCoresUtilizationStatus
OSP-KFIA-N01
MDF Terminal 1 → NOC
Airfield
OSP
144
62%
operational
OSP-KFIA-N02
Cargo → ATC Tower
Airfield
OSP
96
78%
operational
ISP-T1-A17
MDF T1 → IDF Level 2
Terminal 1
ISP
48
91%
degraded
OSP-KFIA-S04
Fuel Farm → Substation 3
Airfield
OSP
72
34%
operational
ISP-T2-B03
IDF-B → Boarding Gates
Terminal 2
ISP
24
88%
fault
STR-DC1-R14
Data Center Row 14
Data Center
Structured
288
55%
operational
OSP-KFIA-E07
Perimeter East Ring
Perimeter
OSP
96
45%
planned
ISP-ADM-C09
Admin Bldg → Server Room
Admin
ISP
24
70%
operational
Active Alarms
AL-091 · critical12 min ago
ISP-T2-B03
Fiber break detected — 3.2 dB loss anomaly
AL-090 · critical1h ago
OSP-KFIA-N02
OTDR trace deviation on core 42
AL-089 · major2h ago
ISP-T1-A17
Utilization threshold 90% exceeded
AL-088 · warning3h ago
MDF-T1
Environmental temp above 26°C
AL-087 · warning5h ago
DC1-Row14
Patch panel port label mismatch
Work Orders
WOTitleTypePriorityAssigneeStatusSLA
WO-4821Splice fault ISP-T2-B03 core 8Fault
P1
A. Al-HarbiIn Progress2h 14m left
WO-4820New circuit — Gate D14 CCTVProvisioning
P3
M. RahmanOpen1d 6h
WO-4818Quarterly OTDR audit Zone NMaintenance
P4
Field Team AIn Progress4d
WO-4815MAC — Move IDF-B patch 24→36Change
P3
S. KhouryOpen18h
WO-4812Investigate high loss OSP-N02Fault
P2
A. Al-HarbiIn Progress6h
SLA Performance

Target vs actual · 30-day

System uptime

99.98%

Last 90 days

As-Builts indexed

14,208

+124 this week

MTTR

2h 47m

Target < 4h

Data accuracy

99.4%

Post-migration audit